New Tent at Lake View Cottage

Click on each picture for a larger view

For many, many summers, this 8x10 platform held a two-person tent that was put up at the beginning of the  summer and taken down at the end.  In 2009, we started construction of a NEW "tent".


Started on June 27


June 28

We decided to increase the size with a new 6x10 platform.  First come the post holes ...


June 29

Framing and placing sub-floor for the extension ...

The first wall frame goes up ...


 


June 30

 

 
Starting the roof joists ...

The sub-roof goes on ...
Rain delay on July 2

Click on each picture for a larger view


July 3
Outside paneling is installed ...

Scott is helping out.


July 5


Real smart maneuver, Jim!

Lucy and Jim went to England to visit Griffin and Melissa.  Actually, Lucy and her sister, Jean, went on a week-long Scandinavian cruise and THEN joined Jim at Griffin's for another week.


August 15
Herman has added stairs and a stone walkway.


Herman starts the new floor


August 16


August 23
Jean took a break from painting to watch ...


Joe and Andre pour concrete.


August 30


Painting ...


priming ...


priming ...


painting ...


Painted baseboards are in


Finally, the  RED trim is painted!


We need some REAL furniture

The painting and interior decorating will be finished over Labor Day weekend. 


September 6


LOOK!  real furniture from Brian & Alexis


A faux stone foundation


September 7


Oh, how I love French doors ...

 One more weekend to finish everything!